RENOVATION

Rebuilding the roof (2015-2019) & the electrical circuit (2015)
2017-10-17-0826-toit-sans-cadres-2400w
Rebuilding the bathroom
(2015-2016)

2015-11-12-0004-sdb-lavabo-1600v

Renewing the floor (2015)


Renewing the main cabin (2015)


Renewing the cabin n°1 (2019)


Renewing the cabin n°2 (2019)


Renewing the roef (2016)


Renewing the kitchen (2016)


Renewing the living room
(2017-2019)


Painting the deck, the roef and the hull (2018)


Re-installing the navigation instruments
(2019)


Maintaining the wooden spars
(20??)


Checking the rigging and fixing problems (20??)


Sewing new sails covers (2020)
2020-07-23-0707-Schavuit-nouveaux-tauds-2400w


Moving the corridor’s door to move the cabin 2 from the workshop area (W) to the living area.

before

after


This website section is still under construction because maintaining a ship is an endless process !