RENOVATION

Step by step
Renewing the roef (2016)
Renewing the kitchen (2016)

Rebuilding the roof (2015-2019) & the electrical circuit (2015)
2017-10-17-0826-toit-sans-cadres-2400w
Rebuilding the bathroom (2015-2016)
2015-11-12-0004-sdb-lavabo-1600v

Renewing the floor (2015)
Renewing the main cabin (2015)

Renewing the cabin n°1 (2019)
Renewing the cabin n°2 (2019)
2018-12-13-0132-cabine2-rangements-2400w

Moving the corridor’s door (2019). To move the cabin 2 from the workshop area (W) to the sleeping area (1 & 2).
2019-12-15-1342-couloir-porte-avant-srcThe corridor’s roof is transparent to maintain the natural light into the corridor.
The door is in red color above the (2). beforeafter

Renewing the living room
(2017-2019)

Painting the deck, the roef and the hull (2018)

Installing navigation instruments
(2019)

2019-10-10.-0164-electronique-2400h
Sewing new sails covers (2020)
2020-07-23-0707-Schavuit-nouveaux-tauds-2400w

Maintaining the wooden spars (2020)
After grinding, I painted 3 layers of a special transparent paint based on linseed oil (Perkoleum Hoogglans, Teak color).
2020-08-05-0415-bout-dehors-poncage-2400h 2020-08-07-0420-bout-dehors-peinture-2400hbefore (top of picture) and after (bottom)

Restoring old blocks
2020-09-21-0454-block-1800h
2020-09-21-0455-blocks-1800h
They are in pitch pine glued with epoxy. Then, they are impregnated with linseed oil and varnished with a linseed oil based transparent paint.
2020-09-08-1559-block-gl-2400h

Checking the rigging and fixing problems (20??)

This website section is still under construction because maintaining a ship is an endless process !